Skip to Main Content
SEI Idea Portal
Status Submitted
Created by Corey Brewster
Created on Oct 24, 2023

EA 8.0 Study Progress Meter

The 4.0 EA has an AIM feature that permitted the ability to see a study progress meter. In EA 8.0, this feature was removed but it was a very useful feature. The client is requesting to bring this feature back or make it even better to show the Accession number of the study instead of just the ckey if possible.


Show individual study level (preferably with Accession label) in this section identified below.